Art from the development of the project.
1999
July 19th
Contract signing is completed.
Unknown
Randy Angle and other development leads visit Wes Jenkins in Seattle where they discuss the vision of the game. Paul Melmed and an unnamed LEGO Media producer also attend.
Unknown
Randy Angle and other development leads visit LEGOLAND California where additional planning with LEGO is done.
September 7th
-DUPLO® Inventures Constructopedia ver. 1.0 is completed.
-Milestone I Art deliverables is completed.
October 8th
-Player Input System Design Document, v5 is completed by Greg Sabatini.
-Resource System Design Document, v3 is completed by Greg Sabatini.
October 12th
-Background System Design Document, v3 is completed by Greg Sabatini.
-Concept art for the Western Town, Prehistoric area, Jungle area, and Farm area is completed.
October 13th
Sound System Design Document, v7 is completed by Greg Sabatini.
October 14th
Concept art for the City/Town area, Playground area, Castle area, and Treehouse area is completed.
October 18th
Cut Scene System Design Document, v8 is completed by Greg Sabatini.
October 19th
-Animation System Design Document, v3 is completed by Randy Angle.
-Monkey Business Programming Policies is completed by Randy Angle.
-Object AI Script System Design Document, v2 is completed by Randy Angle.
-Particle System Design Document, v2 is completed by Randy Angle.
-Procedural Textures System Design Document, v2 is completed by Randy Angle.
-Record Keeping System Design Document, v2 is completed by Randy Angle.
October 20th
-A code schematic is completed by Randy Angle.
-Graphics System Design Document, v2 is completed by Randy Angle.
October 27th
Sample scripts are completed by Wes Jenkins.
October 28th
LEGO Code Design Document, v11 is completed by Randy Angle.
October 29th
DUPLO® Inventures Design Document ver. 3.0 is completed by Randy Angle.
November 1st
The last preproduction milestone is completed.
December 6th
-LEGO project tools document is completed. -Milestone A is completed.
2000
January 7th
-DUPLO® Inventures Design Document ver. 3.2 is finished by Randy Angle
January 10th
-Milestone B is completed.
-K- Duplo- Math script is finished by Doug Kor
-Linguistic In Math G-Howdy is finished by Doug Kor
May 11th-13th
William Dwyer, Randy Angle, and Jay Davis attend E3 where the game is shown.
June 15th
Kindergarten 1.0.20000613.1 Alpha 01 build is completed.